Installation and Restoration of Steel Breakout Prediction System after a Fire in Continuous Casting Workshop of a Steel Plant
Restoration of two-strands steel breakout prediction system: including the assembly and testing of the temperature acquisition electric control box, the laying and connection of the communication cable between the acquisition module and the repeater, and the laying of the long cable of the inner and outer arc thermocouples of the mold, etc.
¥ 0.00
Buy now